I got the velcro on the cavaletti uprights and got them onto the course. I have the cross bars ready to paint, but I’ll do that inside in the morning.
I got paint on the 2x3s (that I’ll use to build ‘the narrows’ obstacle) as well as on the wobble board.
I got the landscape timbers leveled and cross pieces cut and everything in place for the sensory area frame.
I collected tires from around my property, which involved digging some of them out of the sand they were half buried in. I knew I had 1 big tire, but I found another! If only the folks dumping tires on this property while it was abandoned could have been considerate and left me some that were all the same size! LOL
I’m hoping my neighbor can get the Basic area done soon. I’d like to have that mostly built before I start taking reservations for training so I can hopefully get all the construction done (including Master level) before it gets too hot.