LOTS of progress!

Published by

on

I’m usually a night owl, except when I have an exciting project and warm weather 🙂 I woke up before the sun and my brain started working and I knew I should just get up and get started. So by 2 pm when the rain got heavy, I had done the following:

-Walked the dogs

-Unloaded the van

-Wasted 45 min. on a new electric chain saw that kept throwing it’s chain

-Finished cutting the log with a hand saw

-Moved the big log with my neighbor’s tractor (still need to cut the other end and branches off)

-Made the “stepping stones” walk with the logs

-Raked the puppy level area & got a blister in spite of wearing leather gloves

-Rebuilt the puppy level area

-And fixed a broken Pop-up to use the frame to hold the ‘curtains’ of stuff for the dogs to walk through

Then, while it was raining, I went to get the fence posts that were being held at the post office because they were “too heavy”.

Then I went to the tire shop and got 8 tires that are about the same size and look slightly smaller than a standard car tire. They should be perfect for the hanging tire obstacle!

Today, so far, I have unloaded the tires from the van and got them in place,
Dug in the big tire obstacle,
And painted the boards for the ‘plank with obstacles’ feature.

I think you can click on each photo to see a larger version.

Leave a comment

Previous Post
Next Post